Chiller Plant, Washington State University, Pullman, WA


KPFF Consulting Engineers for Washington State University

White Shield supported KPFF and the University with preparation of a site plan of a 400’ x 400’ area for expansion of WSU Chiller Plant facility between South Fairway Road and Round Top Road. Services included a topographic and utility survey with 1’ contours; spot elevations along curbs, sidewalks, road centerline; and building corners, doors, and loading docks. All tree trunks 3’ in diameter and larger were located and labeled with size and drip line included on the plan. White Shield used utility location services, WSU base maps, and existing as-built plans to compile the complete utility survey. Utility covers and lids were pulled to obtain or verify depths, sizes, direction, number, and type of material, and elevations were provided at the top and bottom inside tunnels and vaults. Deliverables were provided in AutoCAD 2004 format drawing files with LDD 2005 DTM files.